The kitchen counter tops are all on now. The 3/4" plywood wrapped in $3.00 Walmart material was nice but the upgrade is nicer. We still have to do above the stove; shelves or cabinets. The one cabinet we have is 48" so it will not fit correctly and I guess we will use that in the mud room. We also trimmed out the top of the half walls, painted them and finished them off with 8-9 layers of wax. It gives them a factory baked finish look, that the fancy cabinet makers have without the need for a walk in oven.

It will be so nice to get the wood floor and base board trim down.
There is Boo Boo in the backgrond and the next room waiting to be started. That will be the living room when we are done. Last weekend we hung the fan & light. We still need to place the fridge in the slot, left of the sink. We must purchase a fridge that is 30" wide as the slot I made and the fridge we found do not match up. Right now the fridge is in the living room. It makes for a big work triangle in the kitchen. lol


It will be so nice to get the wood floor and base board trim down.
There is Boo Boo in the backgrond and the next room waiting to be started. That will be the living room when we are done. Last weekend we hung the fan & light. We still need to place the fridge in the slot, left of the sink. We must purchase a fridge that is 30" wide as the slot I made and the fridge we found do not match up. Right now the fridge is in the living room. It makes for a big work triangle in the kitchen. lol
No comments:
Post a Comment